Leading vehicle manufacturers already have plans for cumulative U.S. production of more than 1.2 million (PEV) electric vehicles by 2015.
(Dept. of Energy EV Status Report – February 2011)
Leading vehicle manufacturers already have plans for cumulative U.S. production of more than 1.2 million (PEV) electric vehicles by 2015.
(Dept. of Energy EV Status Report – February 2011)
Yes. A Level 2 charging station requires a dedicated 240 volt circuit.
(Read more)A Level 2 charging station will reduce the charge time for a Nissan Leaf from 25 hours down to 7.3 ...
(Read more)Yes. The charging station is designed so that no electricity flows through the cord or coupler until after it is ...
(Read more)© 2013 Metro Plug-In





